Briefing on Trelas

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-05-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Trelas is a 201 MW Battery project in Texas, currently active.

Trelasol, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-01.

Queue ID
ERCOT-24INR0416
Location
Mcculloch, Texas
Technology
Battery
Developer
Trelasol, LLC
Market / region
ERCOT
Point of interconnection
76006 Bow Wood 345kV Bus

What stands out

1

Trelas is a 201 MW Battery project in Texas with status active.

2

Trelasol, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-05-01.

Market and operating context

Queue date
2022-09-02
Proposed COD
2028-05-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Trelas — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0416
LocationMcculloch, Texas
TechnologyBattery
DeveloperTrelasol, LLC
Market / regionERCOT
Point of interconnection76006 Bow Wood 345kV Bus
Queue date2022-09-02
Proposed COD2028-05-01