Furay Battery Energy Storage System (ERCOT-24INR0413) — Project Summary

Queue ID
ERCOT-24INR0413
Capacity
304 MW
Technology
Battery
Status
active
Location
Harris, TX
Region
ERCOT
Developer
Blue Topaz 1, LLC
IA Status
Facility Study

Furay Battery Energy Storage System

ERCOT-24INR0413BetaActiveBatteryERCOTLBNL + Live

304 MW storage in Harris, TX · In queue since September 2022 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

304 MW

Capacity

1

Components

Battery

4y 2m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6 years

Facilities Study50%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-30

Queue history
24INR0413 · 49 monthly ERCOT reports, Sep 2022 – Sep 2026

Projected COD moved

4 times

Jun 2024 → Sep 2028

Net change

+51 months

first report to latest

Capacity

304 MW

unchanged in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 2, 2022
Facilities study approvedSep 21, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 30, 2028
From queue filing
Developer in saved assessment
Blue Topaz 1, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue. Facility Study / FIS started with no interconnection agreement executed. Screening study completed. No construction or financing announced.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. ercotqueue.com/project/24INR0413
  2. infrasure.ai/project/ercot-24inr0413-furay-battery-energy-storage-system
  3. app.nrgmap.com/queues/ercot-24inr0413
  4. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0413/furay-battery-energy-storage-system
  5. interconnection.fyi/project/ercot-24inr0413

Commercial operation date: All search results that mention a COD (ercotqueue.com 'Projected COD Q3 2028', infrasure.ai 'Proposed COD 2028-09-30', cleanview 'Expected online 2028') mirror the LBNL/ERCOT queue date. No developer press release or news gives an independent target.

Developer: Every source lists Blue Topaz 1, LLC as the developer, and all of them derive from the queue filing. No parent or operating company was identified in the results.

Status: ERCOT GIS data (September 2026 report via ercotqueue.com) shows 'SS Completed, FIS Started, No IA', and nrgmap shows active as of 1 Sep 2026. This is consistent with the LBNL status of active. The interxdata 'operational' snippet conflicts with this and looks like an aggregator error.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Furay Battery Energy Storage System is a proposed 304 MW battery storage project in Harris County, Texas. Developed by Blue Topaz 1, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0413, with a queue entry date of September 2, 2022. The proposed commercial operation date is September 30, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection is Tap 138kV 45660 Jonte substation _x0013_ 46332 Scenic Woods, tapping both radial lines. Recent news coverage has discussed the development project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Blue Topaz 1, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 45660 Jonte substation – 46332 Scenic Woods Tapping both radial lines.

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Scenic Woods Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.