Camino Ranch Solar SLF (ERCOT-24INR0412) — Project Summary

Queue ID
ERCOT-24INR0412
Capacity
296.42 MW
Technology
Solar+Battery
Status
active
Location
Houston, TX
Region
ERCOT
Developer
Camino Ranch Solar Project LLC
IA Status
Facility Study

Camino Ranch Solar SLF

ERCOT-24INR0412BetaActiveSolarBatteryERCOTLBNL + Live

296.42 MW hybrid in Houston, TX · In queue since October 2022 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

296.42 MW

Capacity

1

Components

Solar

4y 1m

In Queue

Facility Study

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 2m

IA → COD

3 years

Total Duration

3y 2m

Construction50%
Queue EntryOct 6, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 31, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-12-09

Queue history
24INR0412 · 37 monthly ERCOT reports, Jul 2023 – Sep 2026

Projected COD moved

2 times

Sep 2026 → Dec 2028

Net change

+27 months

first report to latest

Capacity

300 → 296 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 6, 2022
Facilities study approvedMay 8, 2026
Interconnection agreement signedDec 31, 2025
On ERCOT's inactive listSep 2023 – Oct 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 2028
From queue filing
Developer in saved assessment
Camino Ranch Solar Project LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, IA pending completion by end of 2025
Financing
Not recorded

Milestones in this assessment

IA executedDec 31, 2025

Interconnection Agreement expected completion by end of 2025

ercot.com
COD targetDec 2028Latest in this assessment

Expected commercial operation December 2028

cleanview.co
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/24INR0412/camino-ranch-solar-slf
  2. ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
  3. interchange.puc.texas.gov/Documents/35077_2392_1579507.PDF
  4. interconnection.fyi/projects/state/TX
  5. ercotqueue.com/project/24INR0412

Commercial operation date: LBNL queue snapshot shows proposed COD of 2028-12-09. No independent news sources or press releases found to confirm or contradict this date. ERCOT capacity chart from Feb 2026 lists 2028 as expected online year, consistent with LBNL.

Developer: Only source is LBNL filing entity 'Camino Ranch Solar Project LLC'. No press releases, corporate announcements, or news coverage found identifying a parent operating company. Entity appears to be project-specific LLC but no parent company identified in available sources.

Status: LBNL shows 'active' status with Facility Study in progress and IA date of 2025-12-31. No news coverage found indicating construction activity, financing, or status changes. Project remains in interconnection study phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Camino Ranch Solar SLF project is a proposed solar generation facility with a total capacity of 296.42 MW. Located in Houston County, Texas, the project is being developed by Camino Ranch Solar Project LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-24INR0412, with a queue entry date of October 6, 2022. The proposed commercial operation date is December 9, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists solely of solar generation, with the entire 296.42 MW capacity attributed to solar photovoltaic technology. The point of interconnection is planned at the Tap to Jim English (#3351) _x0013_ Flat Branch (#3345) 138kV. The project has appeared in recent news coverage regarding energy development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Houston

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Camino Ranch Solar Project LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap to Jim English (#3351) – Flat Branch (#3345) 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.