Riverwalk BESS (ERCOT-24INR0392) — Project Summary

Queue ID
ERCOT-24INR0392
Capacity
120 MW
Technology
Battery
Status
active
Location
Bexar, TX
Region
ERCOT
Developer
RWE Solar Developement, LLC
IA Status
Facility Study

Riverwalk BESS

ERCOT-24INR0392BetaActiveBatteryERCOTLBNL + Live

120 MW storage in Bexar, TX · In queue since July 2022 · Proposed COD October 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

120 MW

Capacity

1

Components

Battery

4y 4m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Facilities Study50%
Queue EntryJul 18, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-01

Queue history
24INR0392 · 51 monthly ERCOT reports, Jul 2022 – Sep 2026

Projected COD moved

2 times

May 2024 → Oct 2027

Net change

+41 months

first report to latest

Capacity

100 → 120 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 18, 2022
Interconnection agreement signedAug 18, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Sep 2027
Differs from queue: Oct 1, 2027
Developer in saved assessment
RWE Clean Energy
Filed as RWE Solar Developement, LLC
Status at research time
Active
Active — construction started October 2024 as part of RWE's 450 MW BESS construction program in Texas
Financing
Secured
Construction financing secured — project broke ground October 2024 as part of RWE's 450 MW Texas BESS construction program

Milestones in this assessment

GroundbreakingOct 2024

RWE broke ground on three Texas BESS projects totaling 450 MW including Riverwalk

rwe.com
COD targetSep 2027Latest in this assessment

Proposed completion date updated from October 2026 to September 2027

interconnectionfyi.substack.com
Research sources and reasoning (3 recorded sources)

high confidence at research time

  1. rwe.com/en/press/rwe-clean-energy/2024-10-02-rwe-starts-construction-of-450-mw-bess-in-the-us/
  2. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5
  3. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0392/riverwalk-bess

Commercial operation date: LBNL shows October 2027, but Interconnection.fyi reported in April 2025 that the proposed completion changed from October 2026 to September 2027. The September 2027 date is more recent and reflects a queue update post-LBNL snapshot.

Developer: LBNL filing entity is 'RWE Solar Developement, LLC' (project SPV). RWE Clean Energy is the operating parent company that announced construction starts for multiple BESS projects in Texas in October 2024, including this project's cohort.

Status: LBNL shows 'active' in Facility Study phase. RWE press release from October 2024 confirms construction has begun on three Texas BESS projects totaling 450 MW, which aligns with this project's timeline and developer.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Riverwalk BESS project is a proposed 120 MW battery storage project located in Bexar County, Texas. Developed by RWE Solar Development, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0392, with a queue entry date of July 18, 2022. The proposed commercial operation date is October 1, 2027, and the project's interconnection status is currently in the Facility Study phase.

The Riverwalk BESS project is designed as a standalone storage facility, consisting entirely of 120 MW of battery capacity. The point of interconnection is the 5294 Martinez Substation at 138kV. The project has appeared in recent news coverage regarding energy storage developments in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Bexar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Solar Developement, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

5294 Martinez Substation 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Martinez Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.