Riverwalk BESS
120 MW storage in Bexar, TX · In queue since July 2022 · Proposed COD October 2027
120 MW
Capacity
1
Components
Battery
4y 4m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 3m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-01
Projected COD moved
2 times
May 2024 → Oct 2027
Net change
+41 months
first report to latest
Capacity
100 → 120 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
RWE broke ground on three Texas BESS projects totaling 450 MW including Riverwalk
rwe.comProposed completion date updated from October 2026 to September 2027
interconnectionfyi.substack.comResearch sources and reasoning (3 recorded sources)
high confidence at research time
- rwe.com/en/press/rwe-clean-energy/2024-10-02-rwe-starts-construction-of-450-mw-bess-in-the-us/
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5
- cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0392/riverwalk-bess
Commercial operation date: LBNL shows October 2027, but Interconnection.fyi reported in April 2025 that the proposed completion changed from October 2026 to September 2027. The September 2027 date is more recent and reflects a queue update post-LBNL snapshot.
Developer: LBNL filing entity is 'RWE Solar Developement, LLC' (project SPV). RWE Clean Energy is the operating parent company that announced construction starts for multiple BESS projects in Texas in October 2024, including this project's cohort.
Status: LBNL shows 'active' in Facility Study phase. RWE press release from October 2024 confirms construction has begun on three Texas BESS projects totaling 450 MW, which aligns with this project's timeline and developer.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Riverwalk BESS project is a proposed 120 MW battery storage project located in Bexar County, Texas. Developed by RWE Solar Development, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0392, with a queue entry date of July 18, 2022. The proposed commercial operation date is October 1, 2027, and the project's interconnection status is currently in the Facility Study phase.
The Riverwalk BESS project is designed as a standalone storage facility, consisting entirely of 120 MW of battery capacity. The point of interconnection is the 5294 Martinez Substation at 138kV. The project has appeared in recent news coverage regarding energy storage developments in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Bexar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
RWE Solar Developement, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5294 Martinez Substation 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Martinez Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.