Query
Riverwalk BESS
Type
Entity Briefing
Entity
Riverwalk BESS
State
TN
Technology
battery
Generated
2026-10-19T12:20:54.684Z

Briefing on Riverwalk BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
120 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-10-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Riverwalk BESS is a 120 MW Battery project in Texas, currently active.

RWE Solar Developement, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-01.

Queue ID
ERCOT-24INR0392
Location
Bexar, Texas
Technology
Battery
Developer
RWE Solar Developement, LLC
Market / region
ERCOT
Point of interconnection
5294 Martinez Substation 138kV

What stands out

1

Riverwalk BESS is a 120 MW Battery project in Texas with status active.

2

RWE Solar Developement, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-10-01.

Market and operating context

Queue date
2022-07-18
Proposed COD
2027-10-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Riverwalk BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0392
LocationBexar, Texas
TechnologyBattery
DeveloperRWE Solar Developement, LLC
Market / regionERCOT
Point of interconnection5294 Martinez Substation 138kV
Queue date2022-07-18
Proposed COD2027-10-01