Alexandrite Storage (ERCOT-24INR0381) — Project Summary

Queue ID
ERCOT-24INR0381
Capacity
203 MW
Technology
Battery
Status
withdrawn
Location
Cameron, TX
Region
ERCOT
Developer
Johnson Energy Storage, LLC
IA Status
Facility Study

Alexandrite Storage

ERCOT-24INR0381BetaWithdrawnBatteryERCOTLBNL + Live

203 MW storage in Cameron, TX · In queue since June 2022 · Proposed COD December 2026

Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

203 MW

Capacity

1

Components

Battery

4y 5m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 6m

Queue EntryJun 27, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Commercial Operation

Proposed COD: 2026-12-10

WithdrawnWithdrawn

Project withdrew from interconnection queue

Queue history
24INR0381 · 48 monthly ERCOT reports, Jun 2022 – Aug 2026

Projected COD moved

1 time

Jun 2024 → Dec 2026

Net change

+30 months

first report to latest

Capacity

203 MW

unchanged in the reports

Latest stage

Cancelled

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 27, 2022
CancelledSep 23, 2026
On ERCOT's inactive listNov 2022 – Jan 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 10, 2026
From queue filing
Developer in saved assessment
Johnson Energy Storage, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage in ERCOT queue, no construction or financing announcements found
Financing
Not recorded

Milestones in this assessment

IA executedJun 27, 2022Latest in this assessment

Entered ERCOT interconnection queue as 24INR0381

cleanview.co
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0381/alexandrite-storage
  2. ercotqueue.com/project/24INR0381
  3. interconnection.fyi/projects/state/TX
  4. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx

Commercial operation date: LBNL queue snapshot shows proposed COD of December 10, 2026. No independent news sources or press releases found to confirm or contradict this date. Cleanview aggregator sites echo the LBNL data but provide no original reporting.

Developer: All sources consistently identify Johnson Energy Storage, LLC as the developer. No press releases, parent company information, or ownership structure details found. Unable to determine if this is a project LLC or operating entity due to lack of corporate disclosure.

Status: LBNL shows 'active' status with Facility Study IA status. No news coverage of project advancement, permitting, or construction activity. ERCOTqueue.com assigns 5% build-chance, suggesting early-stage speculative project.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Alexandrite Storage project is a proposed 203 MW battery energy storage system in Cameron County, Texas. Developed by Johnson Energy Storage, LLC, the project entered the ERCOT interconnection queue as entry ERCOT-24INR0381 on June 27, 2022. Its proposed commercial operation date is December 10, 2026.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 8359 Santa Rosa (S_SNROSA4A) 138kV substation. The Alexandrite Storage project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Johnson Energy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8359 Santa Rosa (S_SNROSA4A) 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.