Briefing/projectactive
Alexandrite Storage is a 203 MW Battery project in Texas, currently active.
Johnson Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-10.
- Queue ID
- ERCOT-24INR0381
- Location
- Cameron, Texas
- Technology
- Battery
- Developer
- Johnson Energy Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- 8359 Santa Rosa (S_SNROSA4A) 138kV
What stands out
1
Alexandrite Storage is a 203 MW Battery project in Texas with status active.
2
Johnson Energy Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-12-10.
Market and operating context
- Queue date
- 2022-06-27
- Proposed COD
- 2026-12-10
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.