Glory Bee Solar (ERCOT-24INR0368) — Project Summary

Queue ID
ERCOT-24INR0368
Capacity
305 MW
Technology
Solar+Battery
Status
active
Location
Erath, TX
Region
ERCOT
Developer
Riley Solar LLC
IA Status
Facility Study

Glory Bee Solar

ERCOT-24INR0368BetaActiveSolarBatteryERCOTLBNL

305 MW hybrid in Erath, TX · In queue since June 2022 · Proposed COD April 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

305 MW

Capacity

1

Components

Solar

4y 1m

In Queue

Facility Study

IA Phase

COD target: 2026

Interconnection

Total Duration

3y 10m

Schedule

3 months past proposed COD

Facilities Study50%
Queue EntryJun 10, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-04-14

Cross-source intelligence
Beta
High confidence·3 sources·as of 2026-06-01
Expected COD
Developer
Belltown Power
Filed as Riley Solar LLC
Status
Withdrawn
Withdrawn — project cancelled by developer in April 2026 per ERCOT queue updates and local community tracking
Financing
Cancelled
Key milestones
WithdrawnApr 2026Most recent

Project withdrawn from ERCOT interconnection queue

source
About

The proposed Glory Bee Solar project is a 305 MW solar generation facility under development by Riley Solar LLC in Erath County, Texas. The project is located within the Electric Reliability Council of Texas (ERCOT) region and is listed in the ERCOT interconnection queue as entry ERCOT-24INR0368, with a queue entry date of June 10, 2022.

The project's proposed commercial operation date is April 14, 2026. Its interconnection status is currently in the Facility Study phase. The point of interconnection is planned at the Tap 345kV 1440 Comanche Switch - 1900 Comanche Peak.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Erath

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Riley Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 1440 Comanche Switch - 1900 Comanche Peak

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Comanche

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.