Anatole Renewable Energy Storage (ERCOT-24INR0355) — Project Summary

Queue ID
ERCOT-24INR0355
Capacity
207.82 MW
Technology
Battery
Status
active
Location
Henderson, TX
Region
ERCOT
Developer
Eustace Storage LLC
IA Status
IA Executed

Anatole Renewable Energy Storage

ERCOT-24INR0355BetaActiveBatteryERCOTLBNL + Live

207.82 MW storage in Henderson, TX · In queue since June 2022 · Proposed COD June 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

207.82 MW

Capacity

1

Components

Battery

4y 5m

In Queue

IA Executed

IA Phase

Signed May 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 11m

IA → COD

3y 1m

Total Duration

1y 11m

Construction75%
Queue EntryJun 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 10, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2027-06-30

Queue history
24INR0355 · 46 monthly ERCOT reports, Dec 2022 – Sep 2026

Projected COD moved

5 times

Jul 2025 → Jun 2027

Net change

+23 months

first report to latest

Capacity

208 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 2, 2022
Facilities study approvedSep 21, 2026
Interconnection agreement signedMay 10, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 1, 2027
Differs from queue: Jun 30, 2027From queue filing
Developer in saved assessment
Anatole Renewable Energy LLC
Filed as Eustace Storage LLC
Status at research time
IA Executed
IA Executed — project active in queue with 90% track record per ercotqueue.com, construction status indicated
Financing
Not recorded

Milestones in this assessment

IA executedMay 10, 2024

Interconnection Agreement executed with ERCOT

interconnection.fyi
COD targetJun 1, 2027Latest in this assessment

Proposed commercial operation date per LBNL queue filing

interconnection.fyi
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0355/anatole-renewable-energy-storage
  2. interconnection.fyi/project/ercot-24inr0355
  3. ercotqueue.com/developer/anatole-renewable-energy-llc
  4. ercot.com/files/docs/2025/03/07/MORA_May2025.pdf
  5. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx

Commercial operation date: LBNL proposed COD of June 1, 2027 is the only explicit date available. Multiple aggregator sites (Cleanview, Interconnection.fyi) echo this date, and ERCOT's March 2025 MORA report lists the project as active with no updated timeline. No press releases or news articles found to contradict.

Developer: LBNL filing entity is 'Eustace Storage LLC' (project-specific shell). Interconnection.fyi and ercotqueue.com identify the operating entity as 'Anatole Renewable Energy LLC', which appears to be the parent/developer. No ownership changes detected.

Status: LBNL shows IA executed May 10, 2024. Ercotqueue.com lists status as 'Construction' with 90% track record. ERCOT March 2025 MORA includes project in active pipeline. One Facebook post mentions 'WITHDRAWN' but lacks credibility vs. official ERCOT sources.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Anatole Renewable Energy Storage project is a proposed 207.82 MW battery storage project located in Henderson County, Texas. The developer is Eustace Storage LLC. It is interconnected within the ERCOT region under queue ID ERCOT-24INR0355, with a queue entry date of June 2, 2022, and a proposed commercial operation date of March 31, 2027.

The project's Interconnection Agreement (IA) has been executed as of May 10, 2024. The point of interconnection is the Eustace Southeast 138kV Substation (Bus# 6951), owned by Rayburn Electric Cooperative.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Henderson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Eustace Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

(Bus# 6951) Eustace Southeast 138kV Substation (owned by Rayburn Electric Cooperative)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Southeast Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.