Briefing on Anatole Renewable Energy Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
208 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-06-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Anatole Renewable Energy Storage is a 208 MW Battery project in Texas, currently active.

Eustace Storage LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-06-01.

Queue ID
ERCOT-24INR0355
Location
Henderson, Texas
Technology
Battery
Developer
Eustace Storage LLC
Market / region
ERCOT
Point of interconnection
(Bus# 6951) Eustace Southeast 138kV Substation (owned by Rayburn Electric Cooperative)

What stands out

1

Anatole Renewable Energy Storage is a 208 MW Battery project in Texas with status active.

2

Eustace Storage LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-06-01.

Market and operating context

Queue date
2022-06-02
Proposed COD
2027-06-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Anatole Renewable Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0355
LocationHenderson, Texas
TechnologyBattery
DeveloperEustace Storage LLC
Market / regionERCOT
Point of interconnection(Bus# 6951) Eustace Southeast 138kV Substation (owned by Rayburn Electric Cooperative)
Queue date2022-06-02
Proposed COD2027-06-01