Mystic Springs Renewable Energy Solar SLF (ERCOT-24INR0339) — Project Summary

Queue ID
ERCOT-24INR0339
Capacity
258.83 MW
Technology
Solar+Battery
Status
active
Location
Kaufman, TX
Region
ERCOT
Developer
Mystic Spring Renewable Energy LLC
IA Status
IA Executed

Mystic Springs Renewable Energy Solar SLF

ERCOT-24INR0339BetaActiveSolarBatteryERCOTLBNL + Live

258.83 MW hybrid in Kaufman, TX · In queue since May 2022 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

258.83 MW

Capacity

1

Components

Solar

4y 6m

In Queue

IA Executed

IA Phase

Signed Oct 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 5m

IA → COD

2y 5m

Total Duration

3y 5m

Construction75%
Queue EntryMay 10, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 30, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-03-31

Queue history
24INR0339 · 46 monthly ERCOT reports, Dec 2022 – Sep 2026

Projected COD moved

4 times

Aug 2025 → Mar 2028

Net change

+31 months

first report to latest

Capacity

262 → 259 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 10, 2022
Facilities study approvedApr 17, 2025
Interconnection agreement signedOct 30, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Mar 31, 2028
From queue filing
Developer in saved assessment
Mystic Spring Renewable Energy LLC
From queue filing
Status at research time
Active
Active — IA executed October 2025, construction timeline targeting 2028 COD
Financing
Not recorded

Milestones in this assessment

IA executedOct 30, 2025

Standard Generation Interconnection Agreement filed with Texas PUC for Mystic Springs Renewable Energy Solar SLF

interchange.puc.texas.gov
COD targetMar 31, 2028Latest in this assessment

ERCOT capacity charts show 258.83 MW solar project targeting 2028 commercial operation

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  2. ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025.xlsx
  3. ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
  4. eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx

Commercial operation date: LBNL queue shows proposed COD of 2028-03-31. ERCOT capacity charts from Nov 2025 and Jan 2026 confirm 2028 target. No contradictory news or press releases found.

Developer: LBNL filing entity is 'Mystic Spring Renewable Energy LLC'. No press releases or news articles found identifying a different parent/operating company. LBL data workbook confirms same entity name.

Status: LBNL shows 'active' status with IA executed on 2025-10-30. Texas PUC filings from November 2025 confirm Standard Generation Interconnection Agreement filing. No withdrawal or suspension signals found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Mystic Springs Renewable Energy Solar SLF is a proposed solar generation project located in Kaufman County, Texas, with a total capacity of 258.83 MW. The developer is Tawakoni Park Solar LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0339, with a queue entry date of May 10, 2022. The proposed commercial operation date is March 31, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection is Tap 345 kV Royse Switch (2478) _x0013_ Poetry Switch (2485).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Kaufman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mystic Spring Renewable Energy LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.