Mystic Springs Renewable Energy Solar SLF is a 259 MW Solar+Battery project in Texas, currently active.
Mystic Spring Renewable Energy LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-03-31.
- Queue ID
- ERCOT-24INR0339
- Location
- Kaufman, Texas
- Technology
- Solar+Battery
- Developer
- Mystic Spring Renewable Energy LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)
What stands out
1
Mystic Springs Renewable Energy Solar SLF is a 259 MW Solar+Battery project in Texas with status active.
2
Mystic Spring Renewable Energy LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-03-31.
Market and operating context
- Queue date
- 2022-05-10
- Proposed COD
- 2028-03-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.