Briefing on Mystic Springs Renewable Energy Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
259 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-03-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Mystic Springs Renewable Energy Solar SLF is a 259 MW Solar+Battery project in Texas, currently active.

Mystic Spring Renewable Energy LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-03-31.

Queue ID
ERCOT-24INR0339
Location
Kaufman, Texas
Technology
Solar+Battery
Developer
Mystic Spring Renewable Energy LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)

What stands out

1

Mystic Springs Renewable Energy Solar SLF is a 259 MW Solar+Battery project in Texas with status active.

2

Mystic Spring Renewable Energy LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-03-31.

Market and operating context

Queue date
2022-05-10
Proposed COD
2028-03-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Mystic Springs Renewable Energy Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0339
LocationKaufman, Texas
TechnologySolar+Battery
DeveloperMystic Spring Renewable Energy LLC
Market / regionERCOT
Point of interconnectionTap 345 kV Royse Switch (2478) – Poetry Switch (2485)
Queue date2022-05-10
Proposed COD2028-03-31