Appaloosa Run BESS
103 MW storage in Upton, TX · In queue since March 2022 · Proposed COD August 2026
103 MW
Capacity
1
Components
Battery
4y 8m
In Queue
Facility Study
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 5m
Schedule
3 months past proposed COD
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-08-30
Projected COD moved
1 time
Aug 2024 → Aug 2026
Net change
+24 months
first report to latest
Capacity
201 → 103 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Queue application submitted to ERCOT, entered Facility Study phase
cleanview.coResearch sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0238/appaloosa-run-bess
- interconnection.fyi/project/ercot-24inr0238
- renewablesinfo.org/project/ercot-24inr0238-appaloosa-run-bess
- ercotqueue.com/project/24INR0238
Commercial operation date: LBNL queue snapshot proposes COD of 2026-08-30. No independent news sources or press releases found to confirm or contradict this date; all search results are aggregator sites echoing LBNL data.
Developer: Only source is LBNL filing entity 'APPALOOSA RUN STORAGE, LLC'. No press releases, corporate announcements, or news coverage found identifying a parent company or operating entity. This appears to be a project-specific LLC with no public parent disclosed.
Status: LBNL status is 'active' at Facility Study stage. No news coverage or milestones found to indicate progression beyond interconnection studies.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Appaloosa Run BESS project is a proposed 100 MW battery storage project located in Upton County, Texas. Developed by APPALOOSA RUN STORAGE, LLC, the project entered the ERCOT interconnection queue as entry ERCOT-24INR0238 on March 7, 2022. The current proposed commercial operation date is August 30, 2026. The project's interconnection status is currently in the Facility Study phase.
The Appaloosa Run BESS project is planned to connect to the New Palouse 138kV substation. Recent news coverage indicates activity related to deals involving the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Upton
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
APPALOOSA RUN STORAGE, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
New Palouse 138kV (#60278)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.