Appaloosa Run BESS is a 103 MW Battery project in Texas, currently active.
APPALOOSA RUN STORAGE, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-08-30.
- Queue ID
- ERCOT-24INR0238
- Location
- Upton, Texas
- Technology
- Battery
- Developer
- APPALOOSA RUN STORAGE, LLC
- Market / region
- ERCOT
- Point of interconnection
- New Palouse 138kV (#60278)
What stands out
1
Appaloosa Run BESS is a 103 MW Battery project in Texas with status active.
2
APPALOOSA RUN STORAGE, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-08-30.
4
Latest linked story: “NextEra Energy picks up DuPont PPA” (reNEWS.BIZ, 2023-04-21).
Market and operating context
- Queue date
- 2022-03-07
- Proposed COD
- 2026-08-30
- IA status
- Facility Study
- Study phase
- Facility Study