Owens Solar (ERCOT-24INR0213) — Project Summary

Queue ID
ERCOT-24INR0213
Capacity
203.5 MW
Technology
Solar
Status
suspended
Location
Bosque, TX
Region
ERCOT
Developer
Owens Solar LLC
IA Status
Facility Study

Owens Solar

ERCOT-24INR0213BetaSuspendedSolarERCOTLBNL

203.5 MW generation in Bosque, TX · In queue since February 2022 · Proposed COD December 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

203.5 MW

Capacity

1

Components

Solar

4y 9m

In Queue

Facility Study

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 10m

Suspended50%
Queue EntryFeb 6, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

Queue history
24INR0213 · 43 monthly ERCOT reports, Feb 2022 – Sep 2025

Projected COD moved

1 time

May 2024 → Dec 2025

Net change

+19 months

first report to latest

Capacity

204 MW

unchanged in the reports

Latest stage

Cancelled

last listed Sep 2025

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 7, 2022
CancelledOct 16, 2025
On ERCOT's inactive listNov 2022 – Nov 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 11 years ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneeight solar plants onlineSan Antonio Express-News · 2015-11-14
Expected CODQ4 2016San Antonio Express-News · 2015-11-14

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Owens Solar is a proposed 203.5 MW solar generation project located in Bosque County, Texas. The project, developed by Owens Solar LLC, is in the ERCOT interconnection queue as entry ERCOT-24INR0213, with a queue entry date of February 7, 2022. The proposed commercial operation date is December 31, 2025. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection for Owens Solar is on the 138kV line between the 177 BOSQUE and 181 Cayote substations. The project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Sep 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Bosque

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Owens Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV line between 177 BOSQUE and 181 Cayote

Data Source

LBNL

DeveloperLightsource bp±Solar Builder · 2021-01-27
ApplicantLeeward Renewable Energy, SamsungShaw Local · 2021-11-18
AgencyDeKalb County BoardShaw Local · 2021-11-18
RulingApprovalShaw Local · 2021-11-18
TransactionProject financingSolar Builder · 2021-01-27
Deal value$380.0MSolar Builder · 2021-01-27
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.