Briefing on Owens Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
204 MW
Proposed capacity
suspended
Current status
Solar
Technology
ERCOT
Market / region
2025-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectsuspended

Owens Solar is a 204 MW Solar project in Texas, currently suspended.

Owens Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-31.

Queue ID
ERCOT-24INR0213
Location
Bosque, Texas
Technology
Solar
Developer
Owens Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV line between 177 BOSQUE and 181 Cayote

What stands out

1

Owens Solar is a 204 MW Solar project in Texas with status suspended.

2

Owens Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2025-12-31.

4

Latest linked story: “‘The horse is out of the barn’: DeKalb County Board approves 3 industrial solar projects by Leeward Energy, Samsung” (Shaw Local, 2021-11-18).

Market and operating context

Queue date
2022-02-06
Proposed COD
2025-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Owens Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0213
LocationBosque, Texas
TechnologySolar
DeveloperOwens Solar LLC
Market / regionERCOT
Point of interconnectionTap 138kV line between 177 BOSQUE and 181 Cayote
Queue date2022-02-06
Proposed COD2025-12-31