Slate Solar Project
104.89 MW generation in Zapata, TX · In queue since December 2021 · Proposed COD January 2030
104.89 MW
Capacity
1
Components
Solar
4y 11m
In Queue
Facility Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 1m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-01-15
Projected COD moved
3 times
Sep 2024 → Jan 2030
Net change
+64 months
first report to latest
Capacity
105 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- cleanview.co/planned-solar-projects/TX/24INR0184/slate-solar-project
- ercotqueue.com/project/24INR0184
Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-10-30. No independent news sources found discussing this specific Zapata County project or providing alternative dates. Cleanview aggregator sites mirror the LBNL date.
Developer: Only source is LBNL filing entity 'Ignis TX Solar Three LLC'. No press releases, corporate announcements, or news coverage found identifying a parent company or operating entity. Unable to determine if this is a shell LLC or the actual developer.
Status: LBNL shows 'active' status in Facility Study phase. No news coverage found to indicate construction activity, financing, or project advancement beyond queue position.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Slate Solar Project is a proposed solar generation project located in Zapata County, Texas, within the ERCOT region. The project, developed by Ignis TX Solar Three LLC, has a total capacity of 104.89 MW. It entered the ERCOT interconnection queue as entry ERCOT-24INR0184 on December 20, 2021, and has a proposed commercial operation date of October 30, 2027. Its interconnection status is currently in the Facility Study phase.
The Slate Solar Project has been the subject of recent news coverage, including reports on deals and regulatory matters.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Zapata
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Ignis TX Solar Three LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 8646 Rio Bravo - 8985 San Ygancio
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Rio Bravo Sub
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.