Slate Solar Project (ERCOT-24INR0184) — Project Summary

Queue ID
ERCOT-24INR0184
Capacity
104.89 MW
Technology
Solar
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
Ignis TX Solar Three LLC
IA Status
Facility Study

Slate Solar Project

ERCOT-24INR0184BetaActiveSolarERCOTLBNL + Live

104.89 MW generation in Zapata, TX · In queue since December 2021 · Proposed COD October 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

104.89 MW

Capacity

1

Components

Solar

4y 7m

In Queue

Facility Study

IA Phase

COD target: 2027

Interconnection

Total Duration

5y 10m

Facilities Study50%
Queue EntryDec 20, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-30

Cross-source intelligence
Beta
Low confidence·2 sources·as of 2026-06-01
Expected COD
Oct 2027
From queue filing
Developer
Ignis TX Solar Three LLC
From queue filing
Status
Active
Active — Facility Study stage per LBNL, no public announcements on construction timeline or financing
Financing
Unannounced
About

The Slate Solar Project is a proposed solar generation project located in Zapata County, Texas, within the ERCOT region. The project, developed by Ignis TX Solar Three LLC, has a total capacity of 104.89 MW. It entered the ERCOT interconnection queue as entry ERCOT-24INR0184 on December 20, 2021, and has a proposed commercial operation date of October 30, 2027. Its interconnection status is currently in the Facility Study phase.

The Slate Solar Project has been the subject of recent news coverage, including reports on deals and regulatory matters.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Ignis TX Solar Three LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 8646 Rio Bravo - 8985 San Ygancio

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Rio Bravo Sub

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Slate Solar Project
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.