Slate Solar Project is a 105 MW Solar project in Texas, currently active.
Ignis TX Solar Three LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-30.
- Queue ID
- ERCOT-24INR0184
- Location
- Zapata, Texas
- Technology
- Solar
- Developer
- Ignis TX Solar Three LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 8646 Rio Bravo - 8985 San Ygancio
What stands out
Slate Solar Project is a 105 MW Solar project in Texas with status active.
Ignis TX Solar Three LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-10-30.
Latest linked story: “Energy Company Raises $837M for Texas Battery Storage Facilities” (Connect CRE, 2024-07-17).
Market and operating context
- Queue date
- 2021-12-20
- Proposed COD
- 2027-10-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.