Frio Farm (ERCOT-24INR0180) — Project Summary

Queue ID
ERCOT-24INR0180
Capacity
106.5 MW
Technology
Solar
Status
active
Location
Frio, TX
Region
ERCOT
Developer
PREMIER ENGINEERING USA CORP.
IA Status
Facility Study

Frio Farm

ERCOT-24INR0180BetaActiveSolarERCOTLBNL + Live

106.5 MW generation in Frio, TX · In queue since December 2021 · Proposed COD June 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

106.5 MW

Capacity

1

Components

Solar

4y 7m

In Queue

Facility Study

IA Phase

COD target: 2026

Interconnection

Total Duration

4y 6m

Schedule

0 months past proposed COD

Facilities Study50%
Queue EntryDec 20, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-25

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-06-01
Expected COD
2026-06-25
From queue filing
Developer
PREMIER ENGINEERING USA CORP.
From queue filing
Status
Active
Active — Facility Study stage per LBNL, no public construction or financing announcements found
Financing
Unannounced
About

The Frio Farm project is a proposed 106.5 MW solar generation project located in Frio County, Texas. Developed by PREMIER ENGINEERING USA CORP., the project consists of 106.5 MW of solar photovoltaic generation. It is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0180, with a queue entry date of December 20, 2021, and a proposed commercial operation date of June 25, 2026. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the 8221 BIG FOOT4A 138kV substation.

The proposed project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Frio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

PREMIER ENGINEERING USA CORP.

Utility

Entity

ERCOT

Service Type

Point of Interconnection

8221 BIG FOOT4A 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.