Query
Frio Farm
Type
Entity Briefing
Entity
Frio Farm
Generated
2026-10-19T18:15:03.036Z

Briefing on Frio Farm

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
107 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-06-25
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Frio Farm is a 107 MW Solar project in Texas, currently active.

PREMIER ENGINEERING USA CORP. is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-06-25.

Queue ID
ERCOT-24INR0180
Location
Frio, Texas
Technology
Solar
Developer
PREMIER ENGINEERING USA CORP.
Market / region
ERCOT
Point of interconnection
8221 BIG FOOT4A 138kV

What stands out

1

Frio Farm is a 107 MW Solar project in Texas with status active.

2

PREMIER ENGINEERING USA CORP. is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-06-25.

Market and operating context

Queue date
2021-12-20
Proposed COD
2026-06-25
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Frio Farm — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0180
LocationFrio, Texas
TechnologySolar
DeveloperPREMIER ENGINEERING USA CORP.
Market / regionERCOT
Point of interconnection8221 BIG FOOT4A 138kV
Queue date2021-12-20
Proposed COD2026-06-25