BRP Hemera BESS (ERCOT-24INR0134) — Project Summary

Queue ID
ERCOT-24INR0134
Capacity
206.96 MW
Technology
Battery
Status
active
Location
Deaf Smith, TX
Region
ERCOT
Developer
BRP Hemera BESS LLC
IA Status
Facility Study

BRP Hemera BESS

ERCOT-24INR0134BetaActiveBatteryERCOTLBNL + Live

206.96 MW storage in Deaf Smith, TX · In queue since December 2021 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

206.96 MW

Capacity

1

Components

Battery

4y 11m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8 years

Facilities Study50%
Queue EntryDec 29, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

Queue history
24INR0134 · 58 monthly ERCOT reports, Dec 2021 – Sep 2026

Projected COD moved

4 times

May 2024 → Dec 2029

Net change

+67 months

first report to latest

Capacity

207 MW

unchanged in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 29, 2021
Facilities study approvedApr 6, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2029
From queue filing
Developer in saved assessment
ENGIE
Filed as BRP Hemera BESS LLC
Status at research time
Active
Active — Facility Study stage, no IA executed yet. Build probability estimated at 5% by third-party trackers.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. live.euronext.com/sites/default/files/company_press_releases/attachments/2026/02/26/cpr03_lesechos_16165_1391055_Liste_des_filiales_et_participations_2025.pdf
  2. zonebourse.com/cours/action/ENGIE-4995/actualite/ENGIE-Liste-des-filiales-et-participations-2024-49180170/
  3. zonebourse.com/actualite-bourse/engie-liste-des-filiales-et-participations-2025-ce7e5cd8da88ff2d
  4. lesechos-comfi.lesechos.fr/press-release/engie-epa-engi-liste-des-filiales-et-participations-2024-neFksBeCKgo

Commercial operation date: Only LBNL queue data provides a COD target of December 2029. No news or press releases found to validate or update this date.

Developer: LBNL filing entity is 'BRP Hemera BESS LLC', a project-specific shell. ENGIE's 2024 and 2025 subsidiary lists (published Feb 2025/2026) show 'BRP Hemera BESS LLC' as a 100%-owned subsidiary under full integration, confirming ENGIE as the parent operating company.

Status: LBNL status is 'active' at Facility Study stage. No news of construction, financing, or withdrawal. Third-party queue trackers note low build probability given early interconnection stage.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The BRP Hemera BESS project is a proposed 206.96 MW battery storage project located in Deaf Smith County, Texas. Developed by BRP Hemera BESS LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-24INR0134. The project entered the interconnection queue on December 29, 2021, and has a proposed commercial operation date of December 1, 2029. Its interconnection status is currently in the Facility Study phase.

The proposed project consists solely of battery storage with a total capacity of 206.96 MW. The point of interconnection is the 345 kV Deaf Smith Substation, owned by Oncor. The BRP Hemera BESS project has appeared in recent news coverage regarding energy storage developments in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Deaf Smith

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Hemera BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345 kV Deaf Smith Substation (#23908, Oncor)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HEARN_RD_RN
POI Substation
Smith Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.