Briefing/projectactive
BRP Hemera BESS is a 207 MW Battery project in Texas, currently active.
BRP Hemera BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.
- Queue ID
- ERCOT-24INR0134
- Location
- Deaf Smith, Texas
- Technology
- Battery
- Developer
- BRP Hemera BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- 345 kV Deaf Smith Substation (#23908, Oncor)
What stands out
1
BRP Hemera BESS is a 207 MW Battery project in Texas with status active.
2
BRP Hemera BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-12-01.
Market and operating context
- Queue date
- 2021-12-29
- Proposed COD
- 2029-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.