Query
BRP Hemera BESS
Type
Entity Briefing
Entity
BRP Hemera BESS
State
TN
Technology
battery
Generated
2026-10-19T10:18:07.415Z

Briefing on BRP Hemera BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
207 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Hemera BESS is a 207 MW Battery project in Texas, currently active.

BRP Hemera BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.

Queue ID
ERCOT-24INR0134
Location
Deaf Smith, Texas
Technology
Battery
Developer
BRP Hemera BESS LLC
Market / region
ERCOT
Point of interconnection
345 kV Deaf Smith Substation (#23908, Oncor)

What stands out

1

BRP Hemera BESS is a 207 MW Battery project in Texas with status active.

2

BRP Hemera BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-01.

Market and operating context

Queue date
2021-12-29
Proposed COD
2029-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Hemera BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0134
LocationDeaf Smith, Texas
TechnologyBattery
DeveloperBRP Hemera BESS LLC
Market / regionERCOT
Point of interconnection345 kV Deaf Smith Substation (#23908, Oncor)
Queue date2021-12-29
Proposed COD2029-12-01