Dovetail Storage (ERCOT-24INR0098) — Project Summary

Queue ID
ERCOT-24INR0098
Capacity
508.7 MW
Technology
Solar+Battery
Status
active
Location
Jack, TX
Region
ERCOT
Developer
Hecate Energy Dovetail Storage LLC
IA Status
Facility Study

Dovetail Storage

ERCOT-24INR0098BetaActiveBatteryBatteryERCOTLBNL + Live

508.7 MW generation in Jack, TX · In queue since September 2021 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

508.7 MW

Capacity

1

Components

Battery

5y 2m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 7m

Facilities Study50%
Queue EntrySep 28, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-12

Queue history
24INR0098 · 52 monthly ERCOT reports, Jun 2022 – Sep 2026

Projected COD moved

4 times

Jun 2024 → Apr 2028

Net change

+46 months

first report to latest

Capacity

509 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 28, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2028
Developer in saved assessment
Hecate Energy
Filed as Hecate Energy Dovetail Storage LLC
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. Hecate lists it as in development, with no construction start or financing announced.
Financing
Not recorded

Milestones in this assessment

Permit approvedJul 2023

Jack County approved a road use agreement with Hecate Energy Dovetail Storage, LLC (July 2023 special session). A related tax abatement was also reported for July 2023.

apps.easydoc.jackcounty.org
COD target2028Latest in this assessment

Cleanview lists the expected online year as 2028.

cleanview.co
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0098/dovetail-storage
  2. hecateenergy.com/projects/
  3. apps.easydoc.jackcounty.org/minutes/LinkedDir/2023/Links%202023-07-31-Special/12%20RUA%20Dovetail%20Storage.pdf
  4. ercotqueue.com/developer/hecate-energy-dovetail-storage-llc
  5. infrasure.ai/project/ercot-24inr0098-dovetail-storage

Commercial operation date: Cleanview lists Dovetail Storage as 'Expected online 2028', which matches the LBNL proposed COD of 2028-04-12. No newer developer press release or financing-backed target was found, so the LBNL date stands and is only loosely corroborated.

Developer: The LBNL filing entity is a project LLC. The Hecate Energy projects page lists Dovetail Storage (Jack County, TX, ~500 MW) as its own project, and the Jack County road use agreement names the same LLC, so Hecate Energy is the operating parent. No ownership change was found.

Status: LBNL shows active status with a Facility Study IA status. The Hecate projects page and the Cleanview and Infrasure listings describe it as planned or proposed, with no sign of construction or withdrawal.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Dovetail Storage project is a proposed 508.7 MW battery energy storage system in Jack County, Texas. The project, developed by Hecate Energy Dovetail Storage LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0098, with a queue entry date of September 28, 2021. The proposed commercial operation date is April 15, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for the Dovetail Storage project is Tap 345 KV 1421 Willow Creek-60515 Clear Crossing CKT#2. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Jack

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy Dovetail Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 KV 1421 Willow Creek-60515 Clear Crossing CKT#2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WCPP_CC1
POI Substation
Willow Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.