Dovetail Solar 2
666.1 MW hybrid in Jack, TX · In queue since October 2021 · Proposed COD April 2029
666.1 MW
Capacity
1
Components
Solar
4y 9m
In Queue
Facility Study
IA Phase
COD target: 2029
Total Duration
7y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-04-20
Dovetail Solar 2 is a proposed solar generation project located in Jack County, Texas, with a total capacity of 666.1 MW. The project is being developed by Hecate Energy Dovetail Solar 2 LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-24INR0095, with a queue entry date of October 26, 2021, and a proposed commercial operation date of April 20, 2029. The project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection for Dovetail Solar 2 is Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing. The project has appeared in recent news coverage regarding solar development in Texas.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Jack
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hecate Energy Dovetail Solar 2 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- WCPP_CC1
- POI Substation
- Willow Creek Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.