Dovetail Solar 1
666.1 MW hybrid in Jack, TX · In queue since September 2021 · Proposed COD April 2028
666.1 MW
Capacity
1
Components
Solar
5y 2m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 7m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-12
Projected COD moved
4 times
Jun 2024 → Apr 2028
Net change
+46 months
first report to latest
Capacity
666 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/solar-farms/texas/24INR0094/dovetail-solar-1
- infrasure.ai/project/ercot-24inr0094-dovetail-solar-1
- interconnection.fyi/project/ercot-24inr0094
- ercotqueue.com/project/24INR0094
- cleanview.co/power-projects/developers/hecate-energy
- apps.easydoc.jackcounty.org/minutes/LinkedDir/2023/Links%202023-07-31-Special/04%20Dovetail.pdf
Commercial operation date: Every source that gives a date (cleanview 'Expected online 2028', interconnection.fyi 'April 12, 2028', infrasure 'Proposed COD: 2028-04-12') repeats the queue filing. There is no press release or news that independently confirms a developer target. One infrasure auto-generated blurb says April 15, 2027, which contradicts its own header and the other sources, so I treated it as noise.
Developer: The LBNL filing entity is a project LLC named with the Hecate Energy brand. The cleanview Hecate Energy developer page lists Dovetail Solar 1 in its pipeline, and the Jack County reinvestment zone map names Hecate Energy, so the operating developer is Hecate Energy. No acquisition or ownership change was found.
Status: LBNL and the queue trackers (ercotqueue.com, interconnection.fyi, infrasure) all show the project as active. ercotqueue.com lists 'No IA' and a 12% build-chance, so there is no evidence of progress beyond the study phase.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Dovetail Solar 1 is a proposed 666.1 MW solar generation project located in Jack County, Texas. The project, developed by Hecate Energy Dovetail Solar 1 LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0094, with a queue entry date of September 21, 2021.
The proposed commercial operation date for Dovetail Solar 1 is April 15, 2027. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing Ckt 2.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Jack
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hecate Energy Dovetail Solar 1 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing Ckt 2
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- WCPP_CC1
- POI Substation
- Willow Creek Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Obtain a complete list of Hecate Energy's operating assets, including in-service dates, to accurately identify plants added since 2023.
Structured data lookup for Hecate Energy with rankings and aggregations.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.