Sypert Branch Solar Project
261.15 MW generation in Milam, TX · In queue since September 2021 · Proposed COD April 2026
261.15 MW
Capacity
1
Components
Solar
5y 2m
In Queue
IA Executed
IA Phase
Signed Oct 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 1m
IA → COD
2y 6m
Total Duration
2y 1m
Schedule
7 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 12–24 months
Proposed COD: 2026-04-30
Projected COD moved
4 times
Dec 2024 → Apr 2026
Net change
+16 months
first report to latest
Capacity
262 → 261 MW
changed in the reports
Latest stage
Synchronized
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Meta signs 260 MW EAPA with ENGIE for all energy output from Sypert Branch
engie-na.comProject expected to come online late 2025 per ENGIE and Meta announcement
utilitydive.comResearch sources and reasoning (5 recorded sources)
high confidence at research time
- utilitydive.com/news/engie-meta-solar-energy-data-center-purchase-agreement-power/731649/
- esgtoday.com/meta-signs-260-mw-solar-energy-purchase-deal-with-engie-to-support-net-zero-goals/
- engie-na.com/engie-and-meta-announce-260-mw-renewable-energy-agreement/
- datacenterdynamics.com/en/news/meta-signs-renewable-supply-agreement-with-engie-in-texas/
- solarbytes.info/engie-meta-completed-eapa-260-mw-sypert-branch-solar-project-texas/
Commercial operation date: Multiple independent sources from Oct-Nov 2024 (Utility Dive, ESG Today, Data Center Dynamics, ENGIE press release) consistently state the project will come online in 'late 2025', which contradicts LBNL's April 2026 target by approximately 4-6 months. The late-2025 timeline is tied to the Meta PPA announcement and represents the developer's current financing-backed target.
Developer: LBNL filing uses project-specific LLC 'Sypert Branch Solar LLC', while all press releases and news coverage (ENGIE corporate announcement, Utility Dive, ESG Today) identify ENGIE North America as the developer, owner, and operator. This is a standard shell-LLC vs. parent-company structure.
Status: LBNL status 'Active' with IA executed Oct 2023 is accurate. Project has advanced significantly with Meta PPA announcement in Oct 2024 and ENGIE confirming they will construct and operate the facility.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Sypert Branch Solar Project is a proposed solar generation project located in Milam County, Texas, with a total capacity of 261.15 MW. Developed by Sypert Branch Solar LLC, the project consists entirely of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-24INR0070, with a queue entry date of September 21, 2021, and a proposed commercial operation date of April 30, 2026.
The project's interconnection agreement has been executed as of October 12, 2023. The point of interconnection is Tap 345kV #3751 Scooter Switch - #3687 Bell County East Switch Ckt 2. The Sypert Branch Solar Project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Milam
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Sypert Branch Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV #3751 Scooter Switch - #3687 Bell County East Switch Ckt 2
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SYBR_SLR_RN
- POI Substation
- Buckholts Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesSypert Branch Solar Project
Data-driven briefing on Sypert Branch Solar Project — fleet, generation, financial, and news signals.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Branch Solar Project
Data-driven briefing on Branch Solar Project — fleet, generation, financial, and news signals.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.