Sypert Branch Solar Project is a 261 MW Solar project in Texas, currently active.
Sypert Branch Solar is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-30.
- Queue ID
- ERCOT-24INR0070
- Location
- Milam, Texas
- Technology
- Solar
- Developer
- Sypert Branch Solar
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV #3751 Scooter Switch - #3687 Bell County East Switch Ckt 2
What stands out
Sypert Branch Solar Project is a 261 MW Solar project in Texas with status active.
Sypert Branch Solar is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-04-30.
Latest linked story: “ENGIE and Meta Announce 260 MW RE Agreement to Support Net Zero Goals” (Energetica India Magazine, 2024-11-01).
Market and operating context
- Queue date
- 2021-09-21
- Proposed COD
- 2026-04-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.