Yaupon Solar SLF (ERCOT-24INR0042) — Project Summary

Queue ID
ERCOT-24INR0042
Capacity
200.78 MW
Technology
Solar
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Yaupon Solar, LLC
IA Status
IA Executed

Yaupon Solar SLF

ERCOT-24INR0042BetaActiveSolarERCOTLBNL + Live

200.78 MW generation in Milam, TX · In queue since March 2021 · Proposed COD November 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200.78 MW

Capacity

1

Components

Solar

5y 8m

In Queue

IA Executed

IA Phase

Signed Sep 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 6m

IA → COD

3y 2m

Total Duration

2y 6m

Schedule

0 months past proposed COD

Construction75%
Queue EntryMar 30, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 28, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-11-18

Queue history
24INR0042 · 59 monthly ERCOT reports, Nov 2021 – Sep 2026

Projected COD moved

6 times

Oct 2024 → Nov 2026

Net change

+25 months

first report to latest

Capacity

204 → 201 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 30, 2021
Facilities study approvedSep 16, 2025
Interconnection agreement signedSep 28, 2023
Approved for energizationMay 27, 2026
Approved for synchronizationAug 13, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Nov 18, 2026
From queue filing
Developer in saved assessment
Yaupon Solar, LLC
From queue filing
Status at research time
Active
Active — IA executed September 2023, FIS complete, project tracking at 86% build probability per ERCOT queue analytics
Financing
Not recorded

Milestones in this assessment

IA executedSep 28, 2023

Interconnection Agreement executed with ERCOT

ercot.com
COD targetNov 18, 2026Latest in this assessment

Target commercial operation date per ERCOT capacity planning

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. ercot.com/files/docs/2024/05/06/Capacity%20Changes%20by%20Fuel%20Type%20Charts_April_2024.xlsx
  2. ercot.com/files/docs/2024/12/06/Capacity%20Changes%20by%20Fuel%20Type%20Charts_November_2024.xlsx
  3. ercotqueue.com/project/24INR0042
  4. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending

Commercial operation date: LBNL queue snapshot shows proposed COD of 2026-11-18. ERCOT capacity charts from May and December 2024 confirm 2026 online date (one shows 2025, one shows 2026). No press releases or developer announcements found to contradict or refine this date.

Developer: All sources consistently identify 'Yaupon Solar, LLC' as the developer. No parent company, operating entity, or ownership change information found in search results. The entity appears to be the actual developer rather than a shell LLC.

Status: LBNL shows 'active' status with IA executed 2023-09-28. Multiple ERCOT sources and queue trackers confirm IA + FIS complete status with high build probability, indicating normal progression toward 2026 COD.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Yaupon Solar SLF is a proposed 204.08 MW solar generation project located in Milam County, Texas. The project, developed by Yaupon Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-24INR0042, with a queue entry date of March 30, 2021. The proposed commercial operation date is July 1, 2027.

The project's Interconnection Agreement (IA) has been executed as of September 28, 2023. The point of interconnection is Tap 345 kV Gibson Switch (3706) _x0013_ TNP One (39950).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Yaupon Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV Gibson Switch (3706) – TNP One (39950)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.