Yaupon Solar SLF is a 201 MW Solar project in Texas, currently active.
Yaupon Solar, is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-11-18.
- Queue ID
- ERCOT-24INR0042
- Location
- Milam, Texas
- Technology
- Solar
- Developer
- Yaupon Solar,
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV Gibson Switch (3706) – TNP One (39950)
What stands out
1
Yaupon Solar SLF is a 201 MW Solar project in Texas with status active.
2
Yaupon Solar, is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-11-18.
Market and operating context
- Queue date
- 2021-03-30
- Proposed COD
- 2026-11-18
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.