San Perlita BESS 2 (ERCOT-23INR0497) — Project Summary

Queue ID
ERCOT-23INR0497
Capacity
150 MW
Technology
Battery
Status
active
Location
Willacy, TX
Region
ERCOT
Developer
RWE Renewables
IA Status
Facility Study

San Perlita BESS 2

ERCOT-23INR0497BetaActiveBatteryERCOTLBNL

150 MW storage in Willacy, TX · In queue since June 2022 · Proposed COD December 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150 MW

Capacity

1

Components

Battery

4y 5m

In Queue

Facility Study

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 6m

Schedule

11 months past proposed COD

Facilities Study50%
Queue EntryJun 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-15

Queue history
23INR0497 · 51 monthly ERCOT reports, May 2022 – Jul 2026

Projected COD moved

1 time

Dec 2023 → Dec 2025

Net change

+24 months

first report to latest

Capacity

150 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jul 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 2, 2022
CancelledAug 7, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Jul 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 15, 2025
From queue filing
Developer in saved assessment
RWE Renewables
Sources agreed at research time
Status at research time
Active
Active — construction likely underway as of Q4 2024 per RWE's October 2024 announcement of 450 MW BESS construction starts in Texas
Financing
Secured
Construction commenced October 2024, indicating financing secured for RWE's 450 MW Texas BESS portfolio (which likely includes this project)

Milestones in this assessment

GroundbreakingOct 2024

RWE announces construction start on three Texas BESS projects totaling 450 MW

rwe.com
COD targetDec 15, 2025Latest in this assessment

Expected commercial operation date per LBNL queue filing

cleanview.co
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. rwe.com/en/press/rwe-clean-energy/2024-10-02-rwe-starts-construction-of-450-mw-bess-in-the-us/
  2. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0497/san-perlita-bess-2
  3. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx

Commercial operation date: LBNL queue shows December 2025 COD. RWE's October 2024 press release announces construction start on three Texas BESS projects totaling 450 MW but does not name San Perlita BESS 2 specifically or provide individual project CODs, so LBNL date remains the only explicit target.

Developer: LBNL filing lists 'RWE Renewables' and all search results consistently confirm RWE Renewables as developer. No shell LLC detected in filings.

Status: LBNL shows 'Active' with Facility Study stage. RWE's October 2, 2024 press release announces construction start on three Texas BESS totaling 450 MW; San Perlita BESS 2 (150 MW) is plausibly one of these three projects given timing and capacity match.

About

Saved background

Generated Apr 10, 2026 · Predates Jul 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

San Perlita BESS 2 is a proposed 150 MW battery storage project located in Willacy County, Texas. The project, being developed by RWE Renewables, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0497, with a queue entry date of June 2, 2022. The proposed commercial operation date is December 15, 2025.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 8601 Cebolla 345kV substation. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jul 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Willacy

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Renewables

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8601 Cebolla 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.