Lamar Unit 1 Repower
66 MW generation in Lamar, TX · In queue since June 2022 · Proposed COD December 2027
66 MW
Capacity
1
Components
Gas
4y 1m
In Queue
Facility Study
IA Phase
COD target: 2027
Total Duration
5y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-18
The Lamar Unit 1 Repower is a proposed 66 MW gas-fired generation project located in Lamar County, Texas. The project is being developed by La Frontera Holdings, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0486, with a queue entry date of June 2, 2022, and a proposed commercial operation date of December 18, 2027. The project's interconnection agreement status is currently in the Facility Study phase.
The proposed project consists of a single 66 MW gas-fired generator. The point of interconnection is the 1692 Paris Switch Station at 345kV. The Lamar Unit 1 Repower project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Lamar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
La Frontera Holdings, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
1692 Paris Switch Station 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- CAMWIND_RN
- POI Substation
- Paredes Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Lamar Unit 1 RepowerForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.