Query
Lamar Unit 1 Repower
Type
Entity Briefing
Entity
Lamar Unit 1 Repower
State
DE
Generated
2026-10-20T02:04:51.674Z

Briefing on Lamar Unit 1 Repower

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
66 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2027-12-18
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Lamar Unit 1 Repower is a 66 MW Gas project in Texas, currently active.

La Frontera Holdings, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-18.

Queue ID
ERCOT-23INR0486
Location
Lamar, Texas
Technology
Gas
Developer
La Frontera Holdings, LLC
Market / region
ERCOT
Point of interconnection
1692 Paris Switch Station 345kV

What stands out

1

Lamar Unit 1 Repower is a 66 MW Gas project in Texas with status active.

2

La Frontera Holdings, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-18.

Market and operating context

Queue date
2022-06-02
Proposed COD
2027-12-18
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Lamar Unit 1 Repower — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0486
LocationLamar, Texas
TechnologyGas
DeveloperLa Frontera Holdings, LLC
Market / regionERCOT
Point of interconnection1692 Paris Switch Station 345kV
Queue date2022-06-02
Proposed COD2027-12-18