Sepanta Solar (ERCOT-23INR0473) — Project Summary

Queue ID
ERCOT-23INR0473
Capacity
217.26 MW
Technology
Solar
Status
active
Location
Nolan, TX
Region
ERCOT
Developer
BREG - Belgian Renewable Energy Group
IA Status
Facility Study

Sepanta Solar

ERCOT-23INR0473BetaActiveSolarERCOTLBNL + Live

217.26 MW generation in Nolan, TX · In queue since October 2022 · Proposed COD September 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

217.26 MW

Capacity

1

Components

Solar

3y 9m

In Queue

Facility Study

IA Phase

COD target: 2029

Interconnection

Total Duration

6y 11m

Facilities Study50%
Queue EntryOct 18, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-18

Cross-source intelligence
Beta
High confidence·4 sources·as of 2026-06-01
Expected COD
undefined 2027
Queue date 3+ years staleQueue: 2029-09-18
Developer
BREG (Belgian Renewable Energy Group)
Confirmed
Status
Active
Active — Under Development, interconnection studies in final stage per BREG, construction targeted Q1 2025
Financing
Unannounced
Key milestones
Groundbreakingundefined 2025

Construction start targeted for beginning of 2025 (Q1 2025 NTP)

source
COD targetundefined 2027Most recent

BREG targets Q1 2027 commercial operations for 225 MW solar project

source
About

The Sepanta Solar project is a proposed solar generation facility with a total capacity of 217.26 MW. The project is located in Nolan County, Texas, and is being developed by BREG - Belgian Renewable Energy Group. It is currently in the ERCOT interconnection queue as project ERCOT-23INR0473, with an interconnection queue entry date of October 18, 2022. The proposed commercial operation date is September 18, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection (POI) is at the 1339 ESKOTA_9 138kV substation, adjacent to the Oncor Sweetwater Eskota Switch #1339. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Nolan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BREG - Belgian Renewable Energy Group

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1339 ESKOTA_9 138kV (PSS/E BUS #1339, Station Name: ESKOTA_8, kV: 138 kV) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #1339. POI would simply be on the other side of the fence of the switch.

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Sepanta Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.