Briefing/projectactive
Sepanta Solar is a 217 MW Solar project in Texas, currently active.
BREG - Belgian Renewable Energy Group is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-18.
- Queue ID
- ERCOT-23INR0473
- Location
- Nolan, Texas
- Technology
- Solar
- Developer
- BREG - Belgian Renewable Energy Group
- Market / region
- ERCOT
- Point of interconnection
- 1339 ESKOTA_9 138kV (PSS/E BUS #1339, Station Name: ESKOTA_8, kV: 138 kV) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #1339. POI would simply be on the other side of the fence of the switch.
What stands out
1
Sepanta Solar is a 217 MW Solar project in Texas with status active.
2
BREG - Belgian Renewable Energy Group is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-09-18.
Market and operating context
- Queue date
- 2022-10-18
- Proposed COD
- 2029-09-18
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.