Query
Sepanta Solar
Type
Entity Briefing
Entity
Sepanta Solar
Generated
2026-10-19T10:34:21.855Z

Briefing on Sepanta Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
217 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-09-18
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Sepanta Solar is a 217 MW Solar project in Texas, currently active.

BREG - Belgian Renewable Energy Group is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-18.

Queue ID
ERCOT-23INR0473
Location
Nolan, Texas
Technology
Solar
Developer
BREG - Belgian Renewable Energy Group
Market / region
ERCOT
Point of interconnection
1339 ESKOTA_9 138kV (PSS/E BUS #1339, Station Name: ESKOTA_8, kV: 138 kV) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #1339. POI would simply be on the other side of the fence of the switch.

What stands out

1

Sepanta Solar is a 217 MW Solar project in Texas with status active.

2

BREG - Belgian Renewable Energy Group is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-09-18.

Market and operating context

Queue date
2022-10-18
Proposed COD
2029-09-18
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sepanta Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0473
LocationNolan, Texas
TechnologySolar
DeveloperBREG - Belgian Renewable Energy Group
Market / regionERCOT
Point of interconnection1339 ESKOTA_9 138kV (PSS/E BUS #1339, Station Name: ESKOTA_8, kV: 138 kV) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #1339. POI would simply be on the other side of the fence of the switch.
Queue date2022-10-18
Proposed COD2029-09-18