Big Elm Storage
120 MW generation in Bell, TX · In queue since April 2022 · Proposed COD December 2028
120 MW
Capacity
1
Components
Battery
4y 7m
In Queue
IA Executed
IA Phase
Signed May 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 1m
IA → COD
4y 7m
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 18–30 months
Proposed COD: 2028-12-15
Projected COD moved
6 times
May 2024 → Dec 2028
Net change
+55 months
first report to latest
Capacity
104 → 120 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Expected online date per industry tracking database
cleanview.coResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- cleanview.co/planned-battery-projects/TX/68181_BELMB/big-elm-storage
- interconnection.fyi/project/ercot-23inr0469
- cms3.revize.com/revize/bellcountytx/public%20notices/Posting%20Notice-Big%20Elm%20Storage,%20LLC%20with%20Attachment%20(Tax%20Abatement%20Agreement).pdf
- cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0469/big-elm-storage
Commercial operation date: Cleanview database (Result 9) reports expected online date of November 2026, which is 2+ years earlier than LBNL's December 2028 target. This represents a significant acceleration likely reflecting post-IA execution progress.
Developer: No parent company or operating entity identified in search results. Bell County tax abatement agreement (Result 11) confirms Big Elm Storage, LLC as the legal entity. No evidence of shell-LLC structure or parent company ownership.
Status: LBNL status of 'IA Executed' (May 2024) is current. Bell County tax abatement agreement confirms local approvals secured. No construction or operational announcements found.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Big Elm Storage is a proposed 100.8 MW battery storage project located in Bell County, Texas. The project, developed by Big Elm Storage, LLC, consists entirely of battery storage. It is listed in the ERCOT interconnection queue as entry ERCOT-23INR0469, with a queue entry date of April 18, 2022, and a proposed commercial operation date of November 10, 2027.
The project has an executed Interconnection Agreement (IA) as of May 10, 2024. Its point of interconnection (POI) is Tap 345 kV 3414 Temple Switch - 3409 Lake Creek. This proposed project is linked to the existing, operating Big Elm Storage facility (EIA plant ID 68181). The Big Elm Storage project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Bell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Big Elm Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
3404 Belfalls 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.