Big Elm Storage is a 120 MW Solar+Battery project in Texas, currently active.
Big Elm Storage, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-15.
- Queue ID
- ERCOT-23INR0469
- Location
- Bell, Texas
- Technology
- Solar+Battery
- Developer
- Big Elm Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- 3404 Belfalls 345kV
What stands out
Big Elm Storage is a 120 MW Solar+Battery project in Texas with status active.
Big Elm Storage, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2028-12-15.
Latest linked story: “Proposed data center project for Waco area would be “paradigm-changer”” (The Texas Tribune, 2025-11-24).
Market and operating context
- Queue date
- 2022-04-18
- Proposed COD
- 2028-12-15
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.