Bronze Quinta Storage (ERCOT-23INR0456) — Project Summary

Queue ID
ERCOT-23INR0456
Capacity
103.51 MW
Technology
Battery
Status
active
Location
Hidalgo, TX
Region
ERCOT
Developer
KCE TX 28, LLC
IA Status
Facility Study

Bronze Quinta Storage

ERCOT-23INR0456BetaActiveBatteryERCOTLBNL + Live

103.51 MW storage in Hidalgo, TX · In queue since January 2022 · Proposed COD January 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

103.51 MW

Capacity

1

Components

Battery

4y 10m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6 years

Facilities Study50%
Queue EntryJan 13, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-01-01

Queue history
23INR0456 · 57 monthly ERCOT reports, Jan 2022 – Sep 2026

Projected COD moved

3 times

Dec 2023 → Jan 2028

Net change

+49 months

first report to latest

Capacity

104 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 13, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jan 1, 2028
From queue filing
Developer in saved assessment
Key Capture Energy
Filed as KCE TX 28, LLC
Status at research time
Active
Active — Facility Study stage, no interconnection agreement yet
Financing
Not recorded

Milestones in this assessment

IA executedLatest in this assessment

No interconnection agreement executed as of current queue status

ercotqueue.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0456/bronze-quinta-storage
  2. cleanview.co/developer/key-capture-energy
  3. interconnection.fyi/project/ercot-23inr0456
  4. ercotqueue.com/developer/kce-tx-28-llc
  5. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx

Commercial operation date: LBNL queue filing shows 2028-01-01 COD. One Cleanview source mentions 'December 2027' but this appears to be a rounding/display variation of the same target. No press releases or financing announcements found to contradict the LBNL date.

Developer: LBNL filing entity is 'KCE TX 28, LLC' which is a project-specific shell. Multiple Cleanview sources explicitly list this project under 'Key Capture Energy's Projects and Development Pipeline,' confirming KCE as the parent operating company.

Status: LBNL shows 'active' status at Facility Study stage with no IA executed. All third-party sources (Cleanview, interconnection.fyi, ercotqueue.com) confirm active status with 'No IA' designation. No evidence of construction activity or withdrawal.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Bronze Quinta Storage project is a proposed 103.51 MW battery storage project located in Hidalgo County, Texas. The developer is KCE TX 28, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0456, with a queue entry date of January 13, 2022. The proposed commercial operation date is January 1, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the S_MCALLN 8371 (S. McAllen 138kV Substation). The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hidalgo

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

KCE TX 28, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

S_MCALLN 8371 (S. McAllen 138kV Substation)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.