Query
Bronze Quinta Storage
Type
Entity Briefing
Entity
Bronze Quinta Storage
Generated
2026-10-20T00:20:23.060Z

Briefing on Bronze Quinta Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
104 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-01-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Bronze Quinta Storage is a 104 MW Battery project in Texas, currently active.

KCE TX 28, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-01.

Queue ID
ERCOT-23INR0456
Location
Hidalgo, Texas
Technology
Battery
Developer
KCE TX 28, LLC
Market / region
ERCOT
Point of interconnection
S_MCALLN 8371 (S. McAllen 138kV Substation)

What stands out

1

Bronze Quinta Storage is a 104 MW Battery project in Texas with status active.

2

KCE TX 28, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-01-01.

Market and operating context

Queue date
2022-01-13
Proposed COD
2028-01-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bronze Quinta Storage — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0456
LocationHidalgo, Texas
TechnologyBattery
DeveloperKCE TX 28, LLC
Market / regionERCOT
Point of interconnectionS_MCALLN 8371 (S. McAllen 138kV Substation)
Queue date2022-01-13
Proposed COD2028-01-01