Coneflower Storage Project (ERCOT-23INR0425) — Project Summary

Queue ID
ERCOT-23INR0425
Capacity
170.85 MW
Technology
Battery
Status
active
Location
Chambers, TX
Region
ERCOT
Developer
Coneflower Storage Project LLC
IA Status
IA Executed

Coneflower Storage Project

ERCOT-23INR0425BetaActiveBatteryERCOTLBNL + Live

170.85 MW storage in Chambers, TX · In queue since December 2021 · Proposed COD February 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

170.85 MW

Capacity

1

Components

Battery

4y 11m

In Queue

IA Executed

IA Phase

Signed Mar 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 3m

IA → COD

3y 11m

Total Duration

2y 3m

Construction75%
Queue EntryDec 20, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMar 25, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-02-28

Queue history
23INR0425 · 51 monthly ERCOT reports, Jul 2022 – Sep 2026

Projected COD moved

4 times

Jun 2024 → Feb 2028

Net change

+44 months

first report to latest

Capacity

170 → 171 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 20, 2021
Facilities study approvedMar 19, 2026
Interconnection agreement signedMar 25, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2027
Differs from queue: Feb 28, 2028From queue filing
Developer in saved assessment
Acciona Energy USA Global, LLC
Filed as Coneflower Storage Project LLC
Status at research time
IA Executed
IA Executed — interconnection agreement signed March 2024, project remains in planning phase with no construction start announced
Financing
Not recorded

Milestones in this assessment

IA executedMar 25, 2024

Interconnection Agreement executed with ERCOT, CenterPoint amendments filed April 2024

interchange.puc.texas.gov
COD targetJun 2027Latest in this assessment

ERCOT capacity planning documents list 170.85 MW battery project with 2027 target

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&ItemMatch=Equal&FilingParty=centerpoint&DocumentType=ALL&SortBy=FilingParty&SortOrder=Descending
  2. ercot.com/files/docs/2025/11/06/Capacity-Changes-by-Fuel-Type-Charts_October_2025_PlannedMonthly.xlsx
  3. lorenz-g.github.io/tesla-megapack-tracker/all-big-batteries.html
  4. eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05

Commercial operation date: LBNL proposes 2027-06-11 COD. Multiple aggregator sites (Cleanview, EIA) echo 2027 or August/September 2027, but these appear derivative of the LBNL filing rather than independent developer announcements. No press releases or news coverage found to validate or update this target.

Developer: LBNL filing uses project-LLC 'Coneflower Storage Project LLC'. The Big Battery Tracker (Result 10) explicitly identifies the parent as 'Acciona Energy USA Global, LLC', consistent with Acciona Energía's active battery storage portfolio.

Status: LBNL reports IA executed 2024-03-25. Texas PUC filings (Result 6) confirm CenterPoint amendments for the project in April 2024. No construction or financing announcements found; status remains pre-construction planning.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Coneflower Storage Project is a proposed 178.92 MW battery storage project located in Chambers County, Texas. The project, developed by Coneflower Storage Project LLC, is currently in the ERCOT interconnection queue as entry ERCOT-23INR0425, with a queue entry date of December 20, 2021. The proposed commercial operation date is June 11, 2027.

The project's Interconnection Agreement (IA) has been executed as of March 25, 2024. The Point of Interconnection (POI) is the 40855 JORDON 138 kV substation. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Chambers

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Coneflower Storage Project LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

40855 JORDON 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
HIGH

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.