Briefing/projectactive
Coneflower Storage Project is a 171 MW Battery project in Texas, currently active.
Coneflower Storage Project LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-06-11.
- Queue ID
- ERCOT-23INR0425
- Location
- Chambers, Texas
- Technology
- Battery
- Developer
- Coneflower Storage Project LLC
- Market / region
- ERCOT
- Point of interconnection
- 40855 JORDON 138 kV
What stands out
1
Coneflower Storage Project is a 171 MW Battery project in Texas with status active.
2
Coneflower Storage Project LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-06-11.
Market and operating context
- Queue date
- 2021-12-20
- Proposed COD
- 2027-06-11
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.