Headcamp Energy Storage Plant (ERCOT-23INR0401) — Project Summary

Queue ID
ERCOT-23INR0401
Capacity
152.88 MW
Technology
Battery
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
Momentum Headcamp LLC
IA Status
IA Executed

Headcamp Energy Storage Plant

ERCOT-23INR0401BetaActiveBatteryERCOTLBNL

152.88 MW storage in Pecos, TX · In queue since December 2021 · Proposed COD November 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

152.88 MW

Capacity

1

Components

Battery

4y 11m

In Queue

IA Executed

IA Phase

Signed Feb 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 2m

IA → COD

1y 9m

Total Duration

2y 2m

Schedule

12 months past proposed COD

Construction75%
Queue EntryDec 3, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 16, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2025-11-26

Queue history
23INR0401 · 54 monthly ERCOT reports, Jan 2022 – Jun 2026

Projected COD moved

6 times

Jan 2024 → Jul 2026

Net change

+30 months

first report to latest

Capacity

150 → 153 MW

changed in the reports

Latest stage

Commercial operation

last listed Jun 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 3, 2021
Facilities study approvedSep 18, 2024
Interconnection agreement signedFeb 16, 2024
Approved for energizationAug 19, 2025
Approved for synchronizationSep 16, 2025
Approved for commercial operationJul 16, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2026
Differs from queue: Nov 26, 2025From queue filing
Developer in saved assessment
Lydian Energy
Filed as Momentum Headcamp LLC
Status at research time
IA Executed
IA Executed — construction underway as of July 2025 following $233M financing close
Financing
Secured
$233M project financing closed July 2025, led by ING and KeyBank, covering Headcamp plus two other Texas BESS projects (Pintail, Crane) totaling 550 MW/1.1 GWh

Milestones in this assessment

IA executedFeb 16, 2024

Interconnection Agreement executed with Texas-New Mexico Power Company

interchange.puc.texas.gov
Financing closeJul 2025

$233M financing closed for Headcamp, Pintail, and Crane projects with ING and KeyBank

energy-storage.news
GroundbreakingJul 2025

Construction initiated following financing close

energy-storage.news
COD targetApr 2026Latest in this assessment

Expected commercial operation April 2026

cleanview.co
Research sources and reasoning (6 recorded sources)

high confidence at research time

  1. energy-storage.news/lydian-energy-closes-us233-million-financing-for-three-texas-bess-provided-by-catl/
  2. utilitydive.com/news/lydian-energy-storage-financing-ercot-texas/753056/
  3. finance.yahoo.com/news/lydian-energy-secures-233m-project-103000663.html
  4. mercomcapital.com/lydian-energy-secures-financing-battery-projects/
  5. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  6. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0401/headcamp-energy-storage-plant

Commercial operation date: LBNL proposes April 2026 COD. News articles from July 2025 confirm financing closed and construction underway, but do not provide an updated COD target. The 2026 date remains plausible given construction status.

Developer: LBNL filing entity is 'Momentum Headcamp LLC' (project shell). Multiple sources (Energy-Storage.News, Yahoo Finance, Mercom) confirm Lydian Energy as the operating developer that secured financing and is executing construction.

Status: LBNL shows IA executed February 2024. News confirms July 2025 financing close for Headcamp (part of three-project portfolio) with construction initiated, consistent with active development post-IA.

About

Saved background

Generated Apr 10, 2026 · Predates Jun 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Headcamp BESS is a proposed 152.88 MW battery storage project in Pecos County, Texas. Developed by Momentum Headcamp LLC, the project consists entirely of battery technology. It is listed in the ERCOT interconnection queue as entry ERCOT-23INR0401, with a queue entry date of December 3, 2021, and a proposed commercial operation date of November 26, 2025. The project's interconnection agreement was executed on February 16, 2024.

The proposed project is linked to the existing Headcamp BESS operating plant (EIA ID 68580). Recent news coverage indicates the project has been mentioned in at least four news articles, primarily related to deals.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jun 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Momentum Headcamp LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 138kV 38331 TN Alamo St – 38455 TN Holiday

Data Source

LBNL

DeveloperLydian EnergyYahoo Finance · 2025-07-09
TransactionProject financingYahoo Finance · 2025-07-09
Deal value$233.0MYahoo Finance · 2025-07-09
LenderING and KeyBankYahoo Finance · 2025-07-09
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
HIGH
Nearest Node (Estimated)
DGFS_ESR_RN
POI Substation
16th Street Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.