Camp Creek Solar SLF
110 MW hybrid in Robertson, TX · In queue since December 2021 · Proposed COD September 2028
110 MW
Capacity
1
Components
Solar
4y 11m
In Queue
IA Executed
IA Phase
Signed Jul 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 7m
IA → COD
5y 2m
Total Duration
1y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2028-09-15
Projected COD moved
3 times
Nov 2023 → Sep 2028
Net change
+58 months
first report to latest
Capacity
166 → 110 MW
changed in the reports
Latest stage
Cancelled
last listed Feb 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
ERCOT Standard Generation Interconnection Agreement executed with CenterPoint Energy Houston Electric
interchange.puc.texas.govERCOT capacity chart lists 2026 as expected online date for 165.6 MW solar facility
ercot.comProposed completion date changed from December 2026 to June 2028 per April 2025 project update
interconnectionfyi.substack.comResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- interconnection.fyi/project/ercot-23inr0385
- ercot.com/files/docs/2024/12/06/Capacity%20Changes%20by%20Fuel%20Type%20Charts_November_2024.xlsx
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
Commercial operation date: LBNL shows 2028-09-15, but ERCOT's December 2024 capacity chart lists 2026 as the expected COD. Interconnection.fyi April 2025 update notes proposed completion changed from Dec 2026 to June 2028, suggesting ongoing delays but more recent target than LBNL's original filing.
Developer: All sources consistently identify White Rock Solar, LLC as the developer. No evidence of shell-LLC structure or ownership changes; appears to be the actual operating entity.
Status: LBNL shows 'active' with IA executed 2023-07-15. However, interconnection.fyi (Result 2) states project is 'currently withdrawn'. This discrepancy suggests recent status change not yet reflected in LBNL data, but ERCOT capacity charts through Nov 2024 still list the project, indicating it may remain in queue.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Camp Creek Solar SLF project is a proposed 165.6 MW solar generation project located in Robertson County, Texas. Developed by White Rock Solar, LLC, the project is currently in the ERCOT interconnection queue as entry ERCOT-23INR0385, with a queue entry date of December 24, 2021. The proposed commercial operation date is September 15, 2028. The project's Interconnection Agreement (IA) has been executed as of July 15, 2023.
The Camp Creek Solar SLF project has been featured in recent news coverage. The point of interconnection is at the TAP 345 KV 3400 TWIN OAK SWITCH - 46020 LIMESTONE PLANT CIRCUIT 1.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Feb 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Robertson
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
White Rock Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
TAP 345 KV 3400 TWIN OAK SWITCH - 46020 LIMESTONE PLANT CIRCUIT 1
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.