Query
Camp Creek Solar SLF
Type
Entity Briefing
Entity
Camp Creek Solar SLF
Technology
solar
Generated
2026-09-18T15:25:51.146Z

Briefing on Camp Creek Solar SLF

Entity Briefing
Generated Sep 18, 2026·Dataset freshness not reported
110 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-15
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Camp Creek Solar SLF is a 110 MW Solar+Battery project in Texas, currently active.

White Rock Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-09-15.

Queue ID
ERCOT-23INR0385
Location
Robertson, Texas
Technology
Solar+Battery
Developer
White Rock Solar, LLC
Market / region
ERCOT
Point of interconnection
TAP 345 KV 3400 TWIN OAK SWITCH - 46020 LIMESTONE PLANT CIRCUIT 1

What stands out

1

Camp Creek Solar SLF is a 110 MW Solar+Battery project in Texas with status active.

2

White Rock Solar, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-09-15.

4

Latest linked story: “Fourth North Escambia FPL Solar Farm Planned South Of Bratt Road” (NorthEscambia.com, 2022-11-28).

Market and operating context

Queue date
2021-12-24
Proposed COD
2028-09-15
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Camp Creek Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0385
LocationRobertson, Texas
TechnologySolar+Battery
DeveloperWhite Rock Solar, LLC
Market / regionERCOT
Point of interconnectionTAP 345 KV 3400 TWIN OAK SWITCH - 46020 LIMESTONE PLANT CIRCUIT 1
Queue date2021-12-24
Proposed COD2028-09-15