Brizo BESS (ERCOT-23INR0342) — Project Summary

Queue ID
ERCOT-23INR0342
Capacity
140.76 MW
Technology
Battery
Status
active
Location
Victoria, TX
Region
ERCOT
Developer
BRP Brizo BESS LLC
IA Status
IA Executed

Brizo BESS

ERCOT-23INR0342BetaActiveBatteryERCOTLBNL + Live

140.76 MW storage in Victoria, TX · In queue since October 2021 · Proposed COD September 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

140.76 MW

Capacity

1

Components

Battery

5y 1m

In Queue

IA Executed

IA Phase

Signed Mar 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 5m

IA → COD

2y 6m

Total Duration

3y 5m

Construction75%
Queue EntryOct 5, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMar 27, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2027-09-01

Queue history
23INR0342 · 60 monthly ERCOT reports, Oct 2021 – Sep 2026

Projected COD moved

3 times

May 2023 → Sep 2027

Net change

+52 months

first report to latest

Capacity

144 → 144 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 5, 2021
Interconnection agreement signedMar 27, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 2027
From queue filing
Developer in saved assessment
BRP Brizo BESS LLC
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed March 27, 2025; project remains in pre-construction phase targeting September 2027 COD
Financing
Not recorded

Milestones in this assessment

IA executedMar 27, 2025

Interconnection Agreement executed with ERCOT

interconnectionfyi.substack.com
COD targetSep 2027Latest in this assessment

Expected commercial operation date September 2027

cleanview.co
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0342/brizo-bess
  2. interconnection.fyi/project/ercot-23inr0342
  3. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-db7
  4. ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025.xlsx

Commercial operation date: LBNL proposed COD of September 2027 is consistently reflected across all aggregator sources (Cleanview, interconnection.fyi, ERCOT capacity charts). No contradictory signals found in research.

Developer: All sources cite 'BRP Brizo BESS LLC' as the developer. No parent company or operating entity identified in search results. The LLC name appears to be the actual developer rather than a shell entity.

Status: LBNL reports IA executed on March 27, 2025, confirmed by interconnection.fyi newsletter (April 2025) noting 'IA date added March 26, 2025'. ERCOT capacity charts (November 2025) show project as not yet online.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Brizo BESS is a proposed 140.76 MW battery storage project located in Victoria County, Texas. The project, developed by BRP Brizo BESS LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0342, with a queue entry date of October 5, 2021. The proposed commercial operation date is December 1, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 138 kV Loop 463 Substation (#5680). The development has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Victoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Brizo BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

138 kV Loop 463 Substation (#5680)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BRP_LOOP_RN
POI Substation
Loop 463 Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.