Liberty Senate Energy Storage 1 (ERCOT-23INR0334) — Project Summary

Queue ID
ERCOT-23INR0334
Capacity
207.4 MW
Technology
Battery
Status
active
Location
Jack, TX
Region
ERCOT
Developer
Senate Solar LLC
IA Status
Facility Study

Liberty Senate Energy Storage 1

ERCOT-23INR0334BetaActiveBatteryERCOTLBNL + Live

207.4 MW storage in Jack, TX · In queue since October 2021 · Proposed COD October 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

207.4 MW

Capacity

1

Components

Battery

5y 1m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6 years

Facilities Study50%
Queue EntryOct 5, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-27

Queue history
23INR0334 · 60 monthly ERCOT reports, Oct 2021 – Sep 2026

Projected COD moved

5 times

Sep 2023 → Oct 2027

Net change

+49 months

first report to latest

Capacity

200 → 207 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 5, 2021
Facilities study approvedMar 31, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Oct 27, 2027
From queue filing
Developer in saved assessment
Senate Solar LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no construction or financing announcements found
Financing
Not recorded

Milestones in this assessment

COD targetOct 2025Latest in this assessment

Original proposed COD of October 2025 changed to October 2027

interconnectionfyi.substack.com
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-602
  2. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0334/liberty-senate-energy-storage-1
  3. interconnection.fyi/project/ercot-23inr0334
  4. renewablesinfo.org/project/ercot-23inr0334-liberty-senate-energy-storage-1
  5. ercotqueue.com/project/23INR0334

Commercial operation date: LBNL queue shows proposed COD of 2027-10-27. One search result (interconnection.fyi newsletter from March 2025) mentions a COD change from October 2025 to October 2027, confirming the current LBNL date. No other sources provide alternative COD targets.

Developer: All sources consistently identify Senate Solar LLC as the developer. No evidence of a parent company or shell LLC structure; appears to be the operating entity itself. No ownership changes or acquisitions found in search results.

Status: LBNL shows 'active' status at Facility Study stage. No press releases, groundbreaking announcements, or construction activity found in search results. Project appears to be in early interconnection study phase with no recent development milestones.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Liberty Senate Energy Storage 1 is a proposed 207.4 MW battery storage project located in Jack County, Texas. The project, developed by Senate Solar LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0334, with a queue entry date of October 5, 2021. The proposed commercial operation date is October 27, 2027. The project's interconnection status is currently in the Facility Study phase, and its point of interconnection is the 1445 Burwick 345kV substation.

The development project consists solely of battery storage, with a total capacity of 207.4 MW. Recent news coverage has discussed the project's progress within the ERCOT interconnection queue.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Jack

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Senate Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

1445 Burwick 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.