Liberty Senate Energy Storage 1
Type
Entity Briefing
Entity
Liberty Senate Energy Storage 1
Technology
battery
Generated
2026-10-19T21:16:41.544Z

Briefing on Liberty Senate Energy Storage 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
207 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-10-27
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Liberty Senate Energy Storage 1 is a 207 MW Battery project in Texas, currently active.

Senate Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-27.

Queue ID
ERCOT-23INR0334
Location
Jack, Texas
Technology
Battery
Developer
Senate Solar LLC
Market / region
ERCOT
Point of interconnection
1445 Burwick 345kV

What stands out

1

Liberty Senate Energy Storage 1 is a 207 MW Battery project in Texas with status active.

2

Senate Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-10-27.

Market and operating context

Queue date
2021-10-05
Proposed COD
2027-10-27
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Liberty Senate Energy Storage 1 — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0334
LocationJack, Texas
TechnologyBattery
DeveloperSenate Solar LLC
Market / regionERCOT
Point of interconnection1445 Burwick 345kV
Queue date2021-10-05
Proposed COD2027-10-27