Orange Grove BESS (ERCOT-23INR0331) — Project Summary

Queue ID
ERCOT-23INR0331
Capacity
61.39 MW
Technology
Solar+Battery
Status
active
Location
Jim Wells, TX
Region
ERCOT
Developer
Talitha Energy Project, LLC
IA Status
IA Executed

Orange Grove BESS

ERCOT-23INR0331BetaActiveBatteryBatteryERCOTLBNL + Live

61.39 MW generation in Jim Wells, TX · In queue since July 2021 · Proposed COD April 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

61.39 MW

Capacity

1

Components

Battery

5y 4m

In Queue

IA Executed

IA Phase

Signed Nov 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 4m

IA → COD

4y 5m

Total Duration

1y 4m

Construction75%
Queue EntryJul 15, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementNov 30, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-04-30

Queue history
23INR0331 · 63 monthly ERCOT reports, Jul 2021 – Sep 2026

Projected COD moved

3 times

May 2023 → Apr 2027

Net change

+47 months

first report to latest

Capacity

61 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 15, 2021
Facilities study approvedMay 3, 2022
Interconnection agreement signedNov 30, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Orange Grove BESS is a proposed 61.39 MW battery storage project located in Jim Wells County, Texas. The project, developed by Talitha Energy Project, LLC, consists of a single 61.39 MW battery component. It is currently in the ERCOT interconnection queue as entry ERCOT-23INR0331, with a queue entry date of July 15, 2021.

The project's proposed commercial operation date is April 30, 2027. An Interconnection Agreement (IA) for the project has been executed as of November 30, 2022. The point of interconnection is the 5660 Orange Grove Switching Station 138 kV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Jim Wells

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Talitha Energy Project, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

5660 Orange Grove Switching Station 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
OGS_SLR_RN
POI Substation
Orange Grove Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.