Tucana BESS (ERCOT-23INR0278) — Project Summary

Queue ID
ERCOT-23INR0278
Capacity
201.3 MW
Technology
Battery
Status
active
Location
Andrews, TX
Region
ERCOT
Developer
BRP Tucana BESS LLC
IA Status
Facility Study

Tucana BESS

ERCOT-23INR0278BetaActiveBatteryERCOTLBNL + Live

201.3 MW storage in Andrews, TX · In queue since June 2021 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.3 MW

Capacity

1

Components

Battery

5y 5m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 9m

Facilities Study50%
Queue EntryJun 3, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-01

Queue history
23INR0278 · 64 monthly ERCOT reports, Jun 2021 – Sep 2026

Projected COD moved

5 times

Aug 2023 → Mar 2028

Net change

+55 months

first report to latest

Capacity

202 → 201 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 3, 2021
Facilities study approvedJun 18, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Mar 1, 2028
From queue filing
Developer in saved assessment
ENGIE
Filed as BRP Tucana BESS LLC
Status at research time
Active
Active — Facility Study stage in ERCOT queue, no IA executed yet
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0278/tucana-bess
  2. live.euronext.com/sites/default/files/company_press_releases/attachments/2026/02/26/cpr03_lesechos_16165_1391055_Liste_des_filiales_et_participations_2025.pdf
  3. zonebourse.com/cours/action/ENGIE-4995/actualite/ENGIE-Liste-des-filiales-et-participations-2024-49180170/

Commercial operation date: LBNL queue snapshot shows proposed COD of March 2028. No independent news sources or press releases found to validate or contradict this date. Cleanview aggregator mirrors LBNL data.

Developer: LBNL filing entity is 'BRP Tucana BESS LLC', a project-specific shell. ENGIE's 2024 and 2025 subsidiary lists (published Feb 2025/2026) show 'BRP Tucana BESS LLC' as a 100%-owned subsidiary under global integration, confirming ENGIE as the parent operating company.

Status: LBNL shows 'active' status with 'Facility Study' IA status. No news of withdrawal, construction start, or financing. Status appears current.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Tucana BESS project is a proposed 201.3 MW battery storage project located in Andrews County, Texas. Developed by BRP Tucana BESS LLC, the project consists of a single 201.3 MW battery component.

The project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0278, with a queue entry date of June 3, 2021. The proposed commercial operation date is March 1, 2028, and the project's interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the 1157 Andrews County South 138kV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Andrews

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Tucana BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

1157 Andrews County South 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Andrews County South Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.