MRG GOODY SOLAR (ERCOT-23INR0225) — Project Summary

Queue ID
ERCOT-23INR0225
Capacity
170.82 MW
Technology
Solar+Battery
Status
active
Location
Lamar, TX
Region
ERCOT
Developer
MRG GOODY SOLAR PROJECT, LLC
IA Status
IA Executed

MRG GOODY SOLAR

ERCOT-23INR0225BetaActiveSolarBatteryERCOTLBNL + Live

170.82 MW hybrid in Lamar, TX · In queue since March 2021 · Proposed COD August 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

170.82 MW

Capacity

1

Components

Solar

5y 8m

In Queue

IA Executed

IA Phase

Signed Nov 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 8m

IA → COD

2y 9m

Total Duration

2y 8m

Schedule

3 months past proposed COD

Construction75%
Queue EntryMar 16, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementNov 7, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2026-08-28

Queue history
23INR0225 · 54 monthly ERCOT reports, Apr 2022 – Sep 2026

Projected COD moved

9 times

Jun 2024 → Aug 2026

Net change

+26 months

first report to latest

Capacity

126 → 171 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 16, 2021
Facilities study approvedJun 17, 2025
Interconnection agreement signedNov 7, 2023
Approved for energizationFeb 6, 2026
Approved for synchronizationMar 27, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2026
Developer in saved assessment
Nexus Renewable Power
Filed as MRG GOODY SOLAR PROJECT, LLC
Status at research time
Construction
Construction — financing closed September 2025, Meta PPA executed, Goldman Sachs-backed $220M funding secured
Financing
Secured
$220 million secured September 2025, led by Goldman Sachs and HPS Investment Partners, for construction of solar+storage facility

Milestones in this assessment

IA executedNov 7, 2023

Interconnection Agreement executed with ERCOT

datacenterdynamics.com
Financing closeSep 2025

Nexus secured $220M from Goldman Sachs and HPS Investment Partners for construction

dallasnews.com
COD target2026Latest in this assessment

Project under construction, expected online 2026

gem.wiki
Research sources and reasoning (6 recorded sources)

high confidence at research time

  1. datacenterdynamics.com/en/news/meta-signs-renewable-supply-agreement-with-nexus-in-lamar-county-texas/
  2. dallasnews.com/business/energy/2025/09/19/nexus-taps-goldman-for-solar-storage-project-in-northeast-texas-that-will-help-juice-meta/
  3. pulse2.com/nexus-220-million-raised-for-developing-energy-storage-assets/
  4. gem.wiki/MRG_Goody_Solar_Project_Hybrid
  5. iesna.com/news-insights/nexus-renewable-power-secures-220m-for-texas-solarstorage-project/
  6. energycapitalhtx.com/cams-project-goody-deal

Commercial operation date: LBNL proposed COD of March 2026 aligns with multiple 2025 sources stating the project is 'under construction' and 'expected online 2026' (Global Energy Monitor, Cleanview). Financing closed in September 2025 supports a 2026 timeline.

Developer: LBNL filing entity is 'MRG GOODY SOLAR PROJECT, LLC' (project SPV), but all press releases and news coverage identify 'Nexus Renewable Power' as the developer and operator securing financing and executing the Meta PPA.

Status: Global Energy Monitor (Feb 2026) explicitly states 'under construction'. Financing close in Sept 2025 and IA executed Nov 2023 confirm transition from Active to Construction phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The MRG GOODY SOLAR project is a proposed solar generation facility with a total capacity of 171.72 MW. Located in Lamar County, Texas, the project is being developed by MRG GOODY SOLAR PROJECT, LLC. It is interconnected within the ERCOT region under queue ID ERCOT-23INR0225, with an interconnection queue entry date of March 16, 2021. The proposed commercial operation date is March 20, 2026, and the Interconnection Agreement (IA) was executed on November 7, 2023.

The project is linked to the existing operating plant named MRG Goody Solar Project Hybrid (EIA plant ID 66390). The project has also been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Lamar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

MRG GOODY SOLAR PROJECT, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693)

Data Source

LBNL + Live

DeveloperNextEra Energy Resources±Energy-Storage.News · 2025-12-10
TransactionPPA±Energy-Storage.News · 2025-12-10
Deal value$220.0MPulse 2.0 · 2025-09-22
OfftakerMeta±Energy-Storage.News · 2025-12-10
LenderHPS Investment PartnersPulse 2.0 · 2025-09-22
PPA structurePhysicalEnergy-Storage.News · 2025-12-10
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-04-09

View all articles