GALVANIC BESS
100 MW storage in Kinney, TX · In queue since February 2021 · Proposed COD December 2027
Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).
100 MW
Capacity
1
Components
Battery
5y 9m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Proposed COD: 2027-12-30
Project withdrew from interconnection queue
Projected COD moved
3 times
May 2024 → Dec 2027
Net change
+43 months
first report to latest
Capacity
100 MW
unchanged in the reports
Latest stage
Cancelled
last listed Aug 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Proposed completion date updated from Nov 2025 to Dec 29, 2026 per ERCOT interconnection study revision
interconnectionfyi.substack.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-7d3
- cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0204/galvanic-bess
- infrasure.ai/project/ercot-23inr0204-galvanic-bess
- ercotqueue.com/project/23INR0204
Commercial operation date: Interconnection FYI (Jan 2025) reports proposed completion changed from Nov 2025 to Dec 29, 2026, which is 1 year earlier than LBNL's Dec 2027 date. This reflects a more recent interconnection study update.
Developer: All sources consistently identify CED Development Inc as the developer with no evidence of shell LLC structure or ownership changes. LBNL filing entity matches operational company name.
Status: LBNL status 'Active' confirmed across all aggregator sources. Project remains in Facility Study phase with no public announcements of financing, permitting, or construction milestones.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Galvanic BESS project is a proposed 100 MW battery storage project located in Kinney County, Texas. Developed by CED Development Inc., the project is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-23INR0204 on February 9, 2021. The proposed commercial operation date is December 30, 2027, and its current interconnection status is Facility Study.
The Galvanic BESS project has been mentioned in recent news coverage related to the grid and energy industry.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Aug 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Kinney
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CED Development Inc
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8252 Bracketville 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.